Forward Control Points (0)
| Emergency Meeting Points (EMP) |
| Forward Control Points (FCP) |
Flood Defence Installations (1)
NGN live high pressure pipe (2)
Evacuation Zones (3)
TSEP pipeline (4)
TSEP exclusion (5)
| Ignition Source Exclusion Zone |
| Thermal Hazard Exclusion Zone |
Small Rest Centres (6)
EA flood warning areas (7)
EA flood zone 2 (8)
EA flood zone 3 (9)
Electricity substations (10.6m flood plan) (10)
Northern Gas Networks block valves (validated) (11)
Northern Gas Networks block valves (not validated) (12)
Flood Alert 946 signs (14)
Flood Warning 710 signs (15)
Flood Warning 712 signs (16)
Flood Warnings 716 & 722 signs (17)
Flood Warnings 720 & 724 signs (18)
A19 Fulford at Germany Beck Bridge road closure signs (19)
Temporary Flood Defences (20)
Hostile Vehicle Mitigation location plan (Jan 2022) (21)
| Access |
| Exit |
| Fixed Bollards |
Lifebuoys (Jan 2023) (22)
|